Assessment and Shop floor Control
The Challenge
AMBE resources were brought in to support a Canadian supplier that was experiencing numerous operational design and technical issues due to lack of responsiveness in tracking KPI’s, OEE and quality evidence. AMBE resources found that communication between shifts was unclear in terms of how shift ran, quality and/or equipment issues, etc. There were several tool use and methodology differences that ultimately resulted in repeat issues during the final inspection and processes. The supplier’s major challenge was changing the teams’ approach, as problems and issues were treated as events and not driven back to a systems solution, with no process to drive behavior.
The Solution
After initial week of assessment, AMBE resources identified several areas of opportunity both short and long term in two phases:
1. PHASE 1: Change System – Focusing on the non-OEM areas and the warehouse procedurally: Process Control, Change Management and KPI tracking/utilization.
2. PHASE 2: Implement Plant Controlled Changes to process- both temporary and permanent
The Result
Customer Visibility
Before
After
KPI’s
Before
After
Supplier Commitment
Before
After
Transparency
Before
After